            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Edward Hefter   -  
Project:   SlingTSI   -   VIEW REPORTS
Total Hours:478.65
Total Flight Time:
Start/Last Date:Sep 22, 2020 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster 3 Blade Constant Speed propeller
Panel:G3X
 
Friendly URL: https://eaabuilderslog.org?s=EH-SlingTSI

Home or Last Project Picture

May 10, 2021     Getting closer on the horizontal stabilizer - (5 hours)       Category: Empennage
Rivet gun - turns out that I needed to disassemble the head, clean all the oil off the jaws, and re-lubricate the mechanism (but NOT the inside of the jaws!) and it works fine. Excellent customer support from Stanley tools on this thing.

With the rivet gun working, it was relatively quick work to assemble the "skeleton" for the horizontal stabilizer. I also did a test fit of the skin. I tried doing one side (top of the stabilizer, from the leading edge to the trailing edge) then the bottom. Next, I tried doing it from the leading edge down both sides evenly. Doing it from the leading edge seems to work best. I may try working from the trailing edge of one side up and over the leading edge down to the trailing edge of the other side next. One thing is certain, though. It is time for me to figure out if and how I want to put corrosion proofing on the inside, line it all up, and rivet it all in place. Then I can move on to the rudder, vertical stabilizer, and elevator.


 